Erection and Commissioning

One particular advantage of SVT’s marine loading arms is that they are shipped with their electrical and hydraulic components
completely installed.

This saves considerable time and money when assembling the marine loading arms. For example, this allowed five 16" LNG loading arms to be completely installed and ready for use in only eight working days.

Before subsequent commissioning, usually only two hydraulic lines and one system cable need to be installed on the bridge per loading arm. This cuts costs and saves time once again.